Electrical switchgear cabinets arranged across a large indoor space
APPLICATIONS

Automatic Transfer Switches for Hospitals.

New electrical distribution equipment built around your project. Discuss specifications, timing and delivery with a U.S. manufacturer.

01 BUILT FOR THE WORK AHEADEquipment photograph shown for illustration.
01 /
MADE IN USAAmerican components
02 /
UL 891Low-voltage switchboards
03 /
SHORT LEAD TIMESSchedule-focused planning
04 /
NATIONWIDEShipping available
01 /

Map the Hospital’s Critical Loads Before Selecting Transfer Equipment

An automatic transfer switch is only as effective as the load plan behind it. Hospitals should identify which circuits require emergency power, how those circuits are grouped, and which source each switch will serve. Life-safety, critical, and equipment branches may have different operating priorities and applicable code requirements; the project team should verify those requirements for the facility and jurisdiction rather than assume one arrangement fits every hospital. Include expected demand, motor starting, essential support systems, and planned future loads in the review. This information helps engineers define transfer-switch functions and ratings for evaluation. It also gives procurement a usable basis for comparing proposals and reduces the risk that an apparently complete equipment package omits a necessary load or interface.

02 /

Coordinate Transfer Logic With Generators and Emergency Power Sources

A transfer switch must coordinate with the actual emergency source, not just the one-line diagram’s nominal voltage. Confirm source characteristics, available fault current, grounding method, generator controls, and the intended sequence for transfer and retransfer with the responsible electrical and controls teams. Hospital operations may also depend on delays that allow generators to stabilize or prevent unnecessary switching during brief disturbances; timing and logic must be specified and reviewed against the system design. Where multiple sources or switches interact, document which equipment initiates each action and how status signals are exchanged. Resolving these interfaces before release helps prevent field changes, commissioning delays, or unexpected interactions between transfer equipment and generator controls.

Copper busbars inside electrical equipment, shown for illustration
THE DETAILS BEHIND THE POWERIllustrative photograph; not represented as our facility. Photo: ToT89.
03 /

Treat Bypass, Isolation, and Maintenance as Operational Decisions

For a facility that cannot casually interrupt essential services, maintenance access deserves attention during equipment selection. The project team should determine whether bypass-isolation functionality is required, what switching arrangement operators expect, and how maintenance procedures will preserve continuity for the loads served. These choices affect the equipment configuration, footprint, controls, and the operating instructions that facility staff need. Do not assume that a particular bypass arrangement is appropriate for every branch or that it eliminates the need for an approved outage plan. Coordinate the proposed design with the hospital’s electrical engineer, facilities personnel, and authority having jurisdiction. Clear requirements at bid stage allow suppliers to address the intended arrangement rather than leave a consequential operating feature ambiguous.

04 /

Check Ratings, Listing Scope, and Project-Specific Compliance

Procurement documents should distinguish required electrical ratings from features that are still subject to engineering review. Identify system voltage and frequency, continuous current, pole configuration, short-circuit conditions, enclosure needs, control voltage, and any specified transition method, then have qualified project personnel confirm suitability. Hospital projects can involve separate code, owner, and authority requirements, so the equipment schedule should state the governing criteria and requested documentation. UL 891 applies to appropriately evaluated low-voltage switchboard assemblies; it is not a blanket certification for transfer switches or medium- and high-voltage equipment. Confirm the applicable evaluation and labeling for the specific offered assembly. This prevents a broad standards reference from being mistaken for proof that every component or configuration meets the project’s requirements.

05 /

Plan the Equipment Room, Connections, and Installation Sequence

A transfer switch that fits on a schedule can still create problems if the room and installation path are overlooked. Verify available wall and floor space, working clearances, cable entry and bending space, access for inspection, and the route from receiving to the final location. Existing hospitals may have narrow service corridors, occupied areas, restricted work hours, or limited outage windows. Share current drawings and site constraints early so the proposed equipment arrangement and connection points can be reviewed before release. Coordinate installation sequencing with the general contractor and facility team, including temporary access and protection of adjacent operations. These checks help identify conflicts while they are still manageable and support a realistic delivery and construction plan.

06 /

Build a Submittal and Delivery Plan That Supports Commissioning

A complete purchase package should connect the equipment schedule to the drawings, control requirements, source and load identification, and the project’s review process. Request project-specific submittals that let the engineer verify dimensions, connections, ratings, and interfaces before fabrication; identify any required changes through the formal review cycle. Discuss target dates, shipping destination, receiving hours, unloading arrangements, and site storage with the U.S. manufacturer, since timing and availability depend on the approved configuration and project conditions. Before turnover, coordinate acceptance testing and staff orientation with the responsible contractors and facility representatives. Keep approved drawings, operating instructions, and test records with the maintenance documentation so future service teams can understand the installed arrangement and its intended operation.

THE DETAILS MATTER

Project
specifications.

Bring your requirements to the conversation. Final configurations are determined by the project scope and applicable standards.

Specifications and project considerations
ParameterProject consideration
ApplicationAutomatic Transfer Switches for Hospitals
Voltage and configurationProject-specific; confirm in quotation
Continuous current and busProject-specific; confirm in quotation
Short-circuit ratingProject-specific; confirm in quotation
Standards and certificationAs applicable; verify for the proposed assembly
Component originAll-American options; confirm in quotation
Lead time and shippingProject-specific; nationwide shipping available
LET'S BUILD SOMETHING

Your project
starts here.

Tell us what you are planning. Share the details you have, and start a conversation about new equipment built for the job.

PREFER TO TALK?
(951) 403-5738
HOUSTON, TEXAS / NATIONWIDE
PROJECT INQUIRY

Request a quote

Fields marked with an asterisk are required.

Submitting opens your email application with your inquiry. Please send the prepared email to complete your request; no information is submitted through this website.

REQUEST A QUOTE