Long row of gray electrical control cabinets with switches and displays
APPLICATIONS

Automatic Transfer Switches for Industrial Facilities.

New electrical distribution equipment built around your project. Discuss specifications, timing and delivery with a U.S. manufacturer.

01 BUILT FOR THE WORK AHEADEquipment photograph shown for illustration.
01 /
MADE IN USAAmerican components
02 /
UL 891Low-voltage switchboards
03 /
SHORT LEAD TIMESSchedule-focused planning
04 /
NATIONWIDEShipping available
01 /

Map the Loads That Must Stay in Service

For an industrial facility, an automatic transfer switch is only as useful as the load plan behind it. Separate essential loads—such as life-safety systems, process controls, cooling, or critical communications—from equipment that can wait or restart later. Record normal and alternate source characteristics, load type, starting behavior, and the consequences of interruption. Large motors, transformers, and nonlinear loads can affect transfer and source capacity decisions, so do not size from a single nameplate total. Identify whether loads are transferred together or in defined groups, and document any sequence or restart limits. These details help engineers select an appropriate switch configuration and coordinate upstream protection. Final ratings and compatibility depend on the actual system and project review.

02 /

Choose the Transfer Arrangement for the Operating Need

The required transfer arrangement depends on what the alternate source can support and how the facility operates. A generator-backed system, a second utility source, and a system with both sources available present different control, interlocking, and switching considerations. Determine whether the design requires open transition, closed transition, or another approved operating sequence; do not assume that paralleling sources is permissible. Specify how the switch should respond to source loss, restoration, and abnormal voltage or frequency, along with any intentional delay needed for generator stabilization or process shutdown. Clarify whether bypass-isolation capability is required to support maintenance while preserving the load path. The engineer of record should verify the sequence, protective-device coordination, and applicable code and project requirements.

Copper busbars inside electrical equipment, shown for illustration
THE DETAILS BEHIND THE POWERIllustrative photograph; not represented as our facility. Photo: ToT89.
03 /

Coordinate Ratings, Protection, and System Compatibility

Procurement should begin with electrical-system data, not a catalog description. Provide nominal voltage, phase, frequency, available fault current, system grounding, source configuration, and the intended transfer-switch function. Confirm the required continuous-current and withstand or closing ratings against the system study and protective-device scheme. A switch’s short-circuit rating and any upstream overcurrent-device conditions must suit the installation; the equipment nameplate alone does not establish system coordination. Include control-power needs, sensing requirements, communications interfaces, and interface points with generator or building-management controls. For industrial environments, also identify enclosure location, ambient conditions, dust, moisture, vibration, and access constraints. The manufacturer can develop a project-specific new-equipment proposal from complete inputs, while final suitability remains subject to engineering review.

04 /

Build the Specification Package Before Requesting a Quote

A useful request for quotation gives bidders the same basis for response. Include one-line diagrams, load schedules, sequence-of-operation notes, preliminary equipment schedules, and available fault-current or coordination information. State whether the scope is a new installation, replacement, or retrofit, and identify the existing equipment and interfaces that must remain compatible. Call out required documentation, inspection hold points, witness testing, labeling, and submittal review expectations rather than leaving them implicit. For a low-voltage switchboard assembly, UL 891 may be relevant when the assembly is appropriately evaluated to that standard; it should not be treated as a blanket certification for every transfer switch or for medium- or high-voltage equipment. Ratings, standards, listings, and included scope must be confirmed for the specific configuration.

05 /

Plan the Installation Around Real Site Constraints

Industrial replacement work is often constrained by production schedules, tight electrical rooms, and limited access routes. Before selecting an equipment footprint, verify doorway and aisle clearances, floor loading, working space, cable-entry direction, conduit locations, and removal paths for existing gear. Establish whether shutdown windows are fixed and what temporary power or load-shedding measures the facility’s qualified team may need to plan. Equipment dimensions, connection locations, and control interfaces should be reviewed against field conditions before release for manufacture; late discrepancies can create costly changes or installation delays. Any tie-in or inspection involving electrical hazards requires the facility’s established safety controls and de-energized work where applicable. The construction team should coordinate installation, testing, and return-to-service responsibilities in advance.

06 /

Align Manufacturing, Submittals, and Delivery With the Project

Discuss schedule assumptions early, because a requested ship date depends on the final scope, approved submittals, component availability, and the manufacturing plan. A U.S. manufacturer offering custom builds and American components can review those preferences alongside the electrical specification, but availability and timing must be confirmed for the individual order. Identify who approves drawings, how comments are resolved, and whether changes after approval affect the schedule. Nationwide shipping still requires practical coordination: confirm delivery location, receiving hours, unloading equipment, staging space, and whether the shipment can reach the electrical room or only a dock. Before placing the order, align commercial scope, documentation, inspection expectations, and delivery responsibilities. A clear record reduces ambiguity for procurement, engineering, the installer, and facility operations.

THE DETAILS MATTER

Project
specifications.

Bring your requirements to the conversation. Final configurations are determined by the project scope and applicable standards.

Specifications and project considerations
ParameterProject consideration
ApplicationAutomatic Transfer Switches for Industrial Facilities
Voltage and configurationProject-specific; confirm in quotation
Continuous current and busProject-specific; confirm in quotation
Short-circuit ratingProject-specific; confirm in quotation
Standards and certificationAs applicable; verify for the proposed assembly
Component originAll-American options; confirm in quotation
Lead time and shippingProject-specific; nationwide shipping available
LET'S BUILD SOMETHING

Your project
starts here.

Tell us what you are planning. Share the details you have, and start a conversation about new equipment built for the job.

PREFER TO TALK?
(951) 403-5738
HOUSTON, TEXAS / NATIONWIDE
PROJECT INQUIRY

Request a quote

Fields marked with an asterisk are required.

Submitting opens your email application with your inquiry. Please send the prepared email to complete your request; no information is submitted through this website.

REQUEST A QUOTE