Close view of gray switchgear cabinets with breakers on wooden pallets
APPLICATIONS

Automatic Transfer Switches for Oil and Gas Facilities.

New electrical distribution equipment built around your project. Discuss specifications, timing and delivery with a U.S. manufacturer.

01 BUILT FOR THE WORK AHEADEquipment photograph shown for illustration.
01 /
MADE IN USAAmerican components
02 /
UL 891Low-voltage switchboards
03 /
SHORT LEAD TIMESSchedule-focused planning
04 /
NATIONWIDEShipping available
01 /

Plan for the Source Conditions at Each Facility

Oil and gas sites can include production areas, gathering stations, compressor facilities, terminals, and processing plants, each with a different combination of utility service and on-site generation. Start an automatic transfer switch (ATS) specification by documenting the normal and alternate sources, nominal voltage and frequency, available fault current, grounding method, and expected source behavior. Identify whether the alternate source is a generator, a second utility supply, or another engineered source; do not assume an ATS can accommodate any source simply because its voltage appears compatible. Source capacity, starting characteristics, protective-device coordination, and transfer and retransfer requirements all affect equipment selection. These details matter because a mismatch can prevent reliable transfer or interfere with upstream and downstream protection. Confirm the design basis with the project electrical engineer and equipment suppliers.

02 /

Separate Loads by Operating Consequence

A site-wide transfer strategy may not suit every load. Determine which circuits support personnel safety, process control, communications, fire protection, critical instrumentation, or orderly shutdown, and which can tolerate interruption or be shed when the alternate source is constrained. The process engineer and electrical designer should establish load priorities and identify motors or other loads whose restart sequence could create a large demand after transfer. Where continuity requirements differ, separate transfer equipment or coordinated load-management provisions may be more appropriate than placing every feeder on one switch. This distinction affects equipment scope, generator capacity, controls, and commissioning. It also helps procurement compare technically equivalent proposals: a quote based on a different load boundary or transfer sequence may not meet the operating intent, even if the nominal ratings match.

Copper busbars inside electrical equipment, shown for illustration
THE DETAILS BEHIND THE POWERIllustrative photograph; not represented as our facility. Photo: ToT89.
03 /

Specify Switching, Controls, and Protection Together

Describe how the ATS should respond to source failure, unacceptable voltage or frequency, restoration, and any required time delays. State whether operation is open transition or another permitted arrangement, and define any restrictions on momentary interruption or paralleling. The intended sequence must align with the generator controls, protective relays, upstream service equipment, and downstream loads; those interfaces are not resolved by selecting a switch rating alone. Ask the design team to document control power, sensing points, alarms, remote status, and required communications so the supplier can evaluate the complete control package. Include bypass-isolation requirements only where maintenance and continuity needs justify them, and confirm the proposed configuration against the project design. Clear sequence descriptions prevent late control changes and make factory review and site acceptance more meaningful.

04 /

Account for Hazardous Areas and Harsh Service

Oil and gas environments demand careful coordination between equipment location, enclosure, and the facility’s hazardous-area classification. An ATS installed in a classified location may require a different placement or protection approach than one located in an electrical room outside that boundary; an ordinary switchboard enclosure should not be treated as suitable for every classified area. Document the classification drawings, indoor or outdoor exposure, ambient conditions, corrosion concerns, dust or moisture exposure, and any site-specific enclosure requirements. Also review seismic, vibration, altitude, and temperature conditions when they apply. These factors can affect component selection, enclosure construction, heat management, access, and installation details. The responsible facility and electrical professionals must verify code and area-classification requirements for the actual location before the equipment configuration is finalized.

05 /

Build the Purchase Package Around Verifiable Documents

A complete request for quotation should include one-line diagrams, load schedules, source data, control narratives, applicable project specifications, and the required drawing and submittal list. Identify interface points with generators, switchboards, protective devices, remote annunciation, and facility monitoring systems, along with the party responsible for each connection. Ask bidders to state assumptions, exceptions, and project-specific compliance details rather than treating a general product description as proof that every configuration meets the specification. For low-voltage switchboard applications, UL 891 may be relevant to an appropriately evaluated assembly; it is not a blanket certification for all ATS equipment or medium- and high-voltage systems. Review proposed ratings, labels, and standards against the actual equipment type and project requirements. This paper trail supports a fair technical comparison and reduces scope gaps before release.

06 /

Coordinate Delivery, Installation, and Acceptance

Custom equipment timing depends on the approved configuration, engineering review, component availability, and the project’s submittal and release process, so establish milestones with the manufacturer early rather than relying on an assumed delivery date. Confirm shipping destination, receiving hours, unloading method, site storage conditions, and any access limits that affect truck or rigging arrangements. For remote production sites, terminals, and facilities with controlled entry, align delivery appointments and documentation with site access and construction sequencing. Before shipment, clarify responsibility for field terminations, interconnection checks, startup, and functional testing. Acceptance planning should verify source sensing, transfer and retransfer sequences, alarms, and interfaces under an approved test plan, with qualified personnel and required safety procedures. Discussing these details during procurement helps prevent equipment arrival from outrunning installation readiness.

THE DETAILS MATTER

Project
specifications.

Bring your requirements to the conversation. Final configurations are determined by the project scope and applicable standards.

Specifications and project considerations
ParameterProject consideration
ApplicationAutomatic Transfer Switches for Oil and Gas Facilities
Voltage and configurationProject-specific; confirm in quotation
Continuous current and busProject-specific; confirm in quotation
Short-circuit ratingProject-specific; confirm in quotation
Standards and certificationAs applicable; verify for the proposed assembly
Component originAll-American options; confirm in quotation
Lead time and shippingProject-specific; nationwide shipping available
LET'S BUILD SOMETHING

Your project
starts here.

Tell us what you are planning. Share the details you have, and start a conversation about new equipment built for the job.

PREFER TO TALK?
(951) 403-5738
HOUSTON, TEXAS / NATIONWIDE
PROJECT INQUIRY

Request a quote

Fields marked with an asterisk are required.

Submitting opens your email application with your inquiry. Please send the prepared email to complete your request; no information is submitted through this website.

REQUEST A QUOTE