Rows of electrical cabinets and overhead cables along an industrial aisle
APPLICATIONS

Automatic Transfer Switches for Wastewater Facilities.

New electrical distribution equipment built around your project. Discuss specifications, timing and delivery with a U.S. manufacturer.

01 BUILT FOR THE WORK AHEADEquipment photograph shown for illustration.
01 /
MADE IN USAAmerican components
02 /
UL 891Low-voltage switchboards
03 /
SHORT LEAD TIMESSchedule-focused planning
04 /
NATIONWIDEShipping available
01 /

Keep Essential Wastewater Loads on a Defined Backup Path

A wastewater facility’s transfer scheme should start with the loads that must remain available when normal utility power fails. Depending on the site, those may include influent pumps, lift stations, aeration equipment, process controls, ventilation, or disinfection systems; not every load necessarily belongs on the same emergency source. Map each load to its normal and alternate supply, identify which equipment can tolerate interruption, and confirm how the standby generator or other source is intended to serve the connected demand. This makes the automatic transfer switch (ATS) selection part of a coordinated distribution plan rather than a standalone equipment purchase. The source arrangement, load sequence, and acceptable interruption time are project-specific. Documenting those decisions early helps engineers and procurement teams compare proposals on the same operational basis.

02 /

Coordinate Transfer Logic With Pumps, Controls, and Generators

Transfer behavior can affect process stability as well as electrical continuity. Large pump motors, blower drives, and other substantial loads may impose starting or restart demands that the alternate source cannot accept all at once. Review motor starting methods, control power, variable-frequency drives, and the facility’s intended load-shedding or restart sequence with the electrical and controls teams. The ATS controls, generator controls, and plant supervisory system should have clearly defined roles: operators need to understand what initiates a transfer, what signals are monitored, and how normal-source restoration is handled. Avoid assuming that an existing sequence will work unchanged with replacement equipment. Current drawings, control narratives, generator data, and a list of loads intended for backup give the manufacturer and project engineer a sound basis for evaluating the requested configuration.

Copper busbars inside electrical equipment, shown for illustration
THE DETAILS BEHIND THE POWERIllustrative photograph; not represented as our facility. Photo: ToT89.
03 /

Specify the Electrical and Environmental Requirements Clearly

An ATS submittal should reflect the actual electrical system and installation conditions, not just a preferred amperage or enclosure style. Confirm system voltage, phase, frequency, available fault-current information, service arrangement, neutral and grounding approach, required switching functions, and the upstream and downstream protective devices. The engineer of record must establish the applicable ratings and coordination requirements for the complete installation. Wastewater sites also present practical enclosure concerns: equipment may be located near wet processes, corrosive atmospheres, washdown areas, outdoor generator pads, or rooms with limited ventilation. Describe exposure, indoor or outdoor placement, access clearances, cable entry direction, and space constraints during quotation. The suitable enclosure, construction, and options depend on the documented conditions and evaluation of the specific assembly; do not infer suitability from a general product description.

04 /

Plan Replacement Work Around Existing Distribution Conditions

Replacing an ATS in an operating treatment plant can be constrained by the equipment it connects to and by the time a process can be out of service. Before specifying a replacement, gather clear nameplate photographs, dimensions, mounting details, cable and bus connections, control wiring information, and the available one-line and elementary diagrams. Record the existing source and load connections, but have qualified project personnel verify field conditions rather than relying on old drawings alone. Differences in footprint, conductor landing space, neutral arrangement, door swing, or control interfaces can require design changes and affect installation planning. A replacement assembly should be evaluated for compatibility with the existing switchboard, generator, protective devices, and facility controls. Identifying discrepancies before release for manufacture reduces avoidable field modifications and helps the owner plan a safe, properly de-energized changeover.

05 /

Build a Procurement Package That Supports Review and Installation

A useful request for quotation gives the manufacturer enough information to identify open engineering questions without turning assumptions into commitments. Include the project one-line diagram, equipment schedule, applicable specifications, source and load details, fault-current and coordination requirements, control points, environmental conditions, and requested submittal documents. State whether the work is new construction, replacement, or part of a broader switchboard project, and identify required interfaces with the generator, building automation, or plant SCADA system. Ask reviewers to confirm dimensions, connection locations, controls, and any proposed deviations before approval. UL 891 applies to appropriately evaluated low-voltage switchboard assemblies; it is not a blanket certification for every ATS or for medium- and high-voltage equipment. Applicable standards, evaluation, labeling, ratings, and documentation must be confirmed for the specific equipment and project scope.

06 /

Discuss Manufacturing Timing and Delivery Before Site Readiness

Schedule coordination matters because wastewater facilities often have narrow installation windows, active process demands, and limited laydown or staging space. Share the required in-service date, approval milestones, outage constraints, receiving hours, unloading capability, delivery access, and any restrictions on truck size or site entry when discussing a new ATS. A U.S. manufacturer can review project specifications, discuss custom-build requirements, and coordinate nationwide shipping, but timing and availability depend on the finalized design, component selection, approvals, and project conditions. Do not treat a preliminary estimate as a guaranteed ship date. Confirm packaging, shipment responsibilities, receiving inspection, and the path from delivery point to electrical room before release. Clear coordination helps the facility align construction, licensed electrical contractors, commissioning resources, and process operations without assuming the equipment can be installed or energized immediately upon arrival.

THE DETAILS MATTER

Project
specifications.

Bring your requirements to the conversation. Final configurations are determined by the project scope and applicable standards.

Specifications and project considerations
ParameterProject consideration
ApplicationAutomatic Transfer Switches for Wastewater Facilities
Voltage and configurationProject-specific; confirm in quotation
Continuous current and busProject-specific; confirm in quotation
Short-circuit ratingProject-specific; confirm in quotation
Standards and certificationAs applicable; verify for the proposed assembly
Component originAll-American options; confirm in quotation
Lead time and shippingProject-specific; nationwide shipping available
LET'S BUILD SOMETHING

Your project
starts here.

Tell us what you are planning. Share the details you have, and start a conversation about new equipment built for the job.

PREFER TO TALK?
(951) 403-5738
HOUSTON, TEXAS / NATIONWIDE
PROJECT INQUIRY

Request a quote

Fields marked with an asterisk are required.

Submitting opens your email application with your inquiry. Please send the prepared email to complete your request; no information is submitted through this website.

REQUEST A QUOTE