Electrical switchgear in a utility room with conduit and fittings on the floor
APPLICATIONS

Electrical Switchboards for Oil and Gas Facilities.

New electrical distribution equipment built around your project. Discuss specifications, timing and delivery with a U.S. manufacturer.

01 BUILT FOR THE WORK AHEADEquipment photograph shown for illustration.
01 /
MADE IN USAAmerican components
02 /
UL 891Low-voltage switchboards
03 /
SHORT LEAD TIMESSchedule-focused planning
04 /
NATIONWIDEShipping available
01 /

Start With the Facility’s Electrical Scope

Oil and gas facilities bring together loads with different operating patterns: process equipment, pumps, compressors, heating, lighting, controls, and utility or generation connections. A switchboard specification should begin with a one-line diagram and a clear account of what the equipment must distribute, isolate, and support—not with a product label alone. Identify the source configuration, system voltage, available fault current, continuous and intermittent loads, and any planned expansion. These details affect bus arrangement, protective-device selection, ratings, and physical layout. The design team should also define normal and emergency operating modes, including which loads must remain available during maintenance or a source transfer. Confirm assumptions with the facility’s electrical engineer and authority having jurisdiction before procurement; unresolved system data can lead to redesign, schedule changes, or equipment that does not fit the intended duty.

02 /

Account for Process-Area Conditions

The installation environment can influence enclosure construction, access, cooling, and component selection. Gather site-specific information on ambient temperatures, dust, moisture, corrosive agents, vibration, and exposure to washdown or outdoor weather. For classified locations, the electrical design must establish the area classification and equipment boundaries; a conventional switchboard should not be assumed suitable for installation inside a classified area. The project may instead place distribution equipment in a designated electrical room or other approved location, with field wiring routed to process loads. Room dimensions, ventilation, fire protection, and service clearances matter as much as the equipment footprint. Document these conditions early and have qualified engineering personnel confirm applicable codes and installation requirements. A mismatch between the actual environment and specified enclosure or location can affect reliability, inspection, and safe maintenance.

Copper busbars inside electrical equipment, shown for illustration
THE DETAILS BEHIND THE POWERIllustrative photograph; not represented as our facility. Photo: ToT89.
03 /

Coordinate Ratings and Protective Devices

Available fault current and the upstream and downstream protection scheme are central to switchboard selection. Provide current utility or generator data, transformer information, grounding details, and the intended protective-device coordination basis. Engineers can then evaluate interrupting and withstand requirements, device settings, selective coordination objectives, and arc-flash study inputs as applicable to the project. Do not treat a nominal voltage or ampere rating as proof that an assembly is suitable for a particular system; ratings and compatibility depend on the complete configuration and evaluation. If the facility expects future motors, additional process trains, or a changed source, identify those plans so the design can consider spare space and capacity without assuming every future addition is covered. Review the one-line diagram, equipment schedule, and protection requirements together before release. That review helps prevent field changes that delay commissioning.

04 /

Define Construction, Documentation, and Review

A useful request for quotation gives the manufacturer enough information to identify the intended assembly and its interfaces. Include the latest one-line diagram, load schedule, system data, preliminary layout, cable-entry preferences, control requirements, and project specifications, noting which documents are preliminary. State required submittals, review milestones, labeling conventions, and any approved component preferences. American components and custom configurations may be available, but the exact component choices and assembly details depend on the project scope and review. For low-voltage switchboard assemblies, UL 891 may be relevant where the design and evaluation meet its scope; it is not a blanket designation for medium- or high-voltage equipment, and it should not be assumed for every assembly. Resolve deviations and interface questions in writing before fabrication. Clear document control reduces conflicting revisions and gives installers a reliable basis for planning.

05 /

Plan Timing Around Decisions and Site Readiness

A short manufacturing lead time can be valuable on a constrained project, but no delivery period should be treated as guaranteed before the scope, review process, and availability are confirmed. Schedule risk often comes from late engineering inputs, long approval cycles, changing device selections, or incomplete site details rather than fabrication alone. Ask for a project-specific schedule that identifies information needed from the customer, drawing review points, release for production, and anticipated shipping coordination. In parallel, verify that foundations or housekeeping pads, room access, cable pathways, ventilation, and receiving arrangements are progressing to the approved layout. If an outage or tie-in window is involved, coordinate it with operations and the installation contractor well in advance. Aligning these activities helps reduce storage, rehandling, and the chance that equipment arrives before the site can receive or install it.

06 /

Coordinate Delivery, Installation, and Handover

Oil and gas sites may have controlled entry, restricted truck access, security procedures, lifting limits, or receiving windows that shape how equipment is shipped and handled. Share the delivery address, site contact, access rules, unloading capability, and any packaging or sequencing needs during order planning; nationwide shipping does not remove the need for site-specific coordination. Confirm the shipping configuration and handling instructions against the approved equipment layout, and ensure the receiving team can inspect and store the assembly in suitable conditions. Before installation, the responsible contractor should verify dimensions, clearances, anchorage, grounding, and field connections against project documents. Commissioning and energization must follow the approved procedures and be performed by qualified personnel, with required work de-energized and appropriately verified. Collect final drawings, device information, test documentation when specified, and approved revisions for the facility’s maintenance records.

THE DETAILS MATTER

Project
specifications.

Bring your requirements to the conversation. Final configurations are determined by the project scope and applicable standards.

Specifications and project considerations
ParameterProject consideration
ApplicationElectrical Switchboards for Oil and Gas Facilities
Voltage and configurationProject-specific; confirm in quotation
Continuous current and busProject-specific; confirm in quotation
Short-circuit ratingProject-specific; confirm in quotation
Standards and certificationAs applicable; verify for the proposed assembly
Component originAll-American options; confirm in quotation
Lead time and shippingProject-specific; nationwide shipping available
LET'S BUILD SOMETHING

Your project
starts here.

Tell us what you are planning. Share the details you have, and start a conversation about new equipment built for the job.

PREFER TO TALK?
(951) 403-5738
HOUSTON, TEXAS / NATIONWIDE
PROJECT INQUIRY

Request a quote

Fields marked with an asterisk are required.

Submitting opens your email application with your inquiry. Please send the prepared email to complete your request; no information is submitted through this website.

REQUEST A QUOTE