Flatbed truck carrying electrical cabinets outdoors under a blue sky
APPLICATIONS

Motor Control Centers for Petrochemical Facilities.

New electrical distribution equipment built around your project. Discuss specifications, timing and delivery with a U.S. manufacturer.

01 BUILT FOR THE WORK AHEADEquipment photograph shown for illustration.
01 /
MADE IN USAAmerican components
02 /
UL 891Low-voltage switchboards
03 /
SHORT LEAD TIMESSchedule-focused planning
04 /
NATIONWIDEShipping available
01 /

Start With the Process Loads and Operating Duty

A petrochemical motor control center should be developed from the process equipment it will serve, not from a generic lineup schedule. Identify each motor’s voltage, horsepower, full-load current, starting method, duty cycle, control interface, and required level of availability. Pumps, compressors, mixers, fans, and package equipment can impose very different starting and operating demands; overlooking those differences can lead to unsuitable buckets, bus arrangements, or coordination assumptions. Confirm whether motors are across-the-line, reduced-voltage, or driven by variable-frequency equipment, and identify which controls or drives belong in the MCC versus a separate package. The design team also needs the latest motor list, one-line diagram, and control narratives. Final ratings, construction, protection, and compatibility are project-specific and should be checked against the facility’s electrical study and applicable requirements.

02 /

Account for Hazardous Areas Without Overstating MCC Scope

Petrochemical sites may include classified locations, but an MCC installed in a control room or electrical building is not automatically suitable for installation in a hazardous area. Confirm the equipment’s exact location, area classification boundaries, environmental conditions, and the facility’s approach to separation from process hazards. This matters because location and installation details can affect enclosure selection, wiring methods, cable entry, ventilation, and the interface with field devices. Coordinate the MCC layout with plot plans and hazardous-area drawings, and identify whether associated starters, instruments, or local stations are outside the MCC room. Do not treat a general-purpose enclosure or a product description as evidence of suitability for a classified location. The responsible engineering team must establish the applicable requirements and verify that each selected component and installation method meets them.

Copper busbars inside electrical equipment, shown for illustration
THE DETAILS BEHIND THE POWERIllustrative photograph; not represented as our facility. Photo: ToT89.
03 /

Coordinate Protection, Selectivity, and Control Interfaces

Motor protection and upstream coordination deserve early review because an interruption can affect process continuity as well as electrical safety. Provide available fault-current information, upstream protective-device data, grounding details, and the latest short-circuit and coordination study when requesting a proposal. Clarify how each starter will receive control power, permissives, trips, and status signals, including interfaces to a distributed control system or plant safety system. Inconsistent device assumptions between the MCC, switchgear, transformers, and motor-drive packages can complicate study updates, commissioning, and future troubleshooting. Identify required communications protocols and monitoring points without assuming a particular control platform is included. Protective-device selection, interrupting ratings, coordination, and communications compatibility must be confirmed for the actual system; they should not be inferred from horsepower alone or promised before the relevant project information is reviewed.

04 /

Resolve Site Conditions and Maintenance Access Early

A technically suitable lineup can still create installation and maintenance problems if the electrical room is planned around nominal dimensions alone. Confirm room access, door and aisle clearances, ceiling height, floor loading, housekeeping pads, cable-trench or overhead-entry arrangements, and the route from the receiving point to the final location. Petrochemical facilities may also require consideration of ambient temperature, humidity, dust, corrosive agents, vibration, or washdown exposure; document the conditions rather than relying on a broad site label. Maintenance teams should review whether units can be accessed and serviced without obstructing adjacent equipment or normal egress. These constraints influence enclosure decisions, lineup sections, shipping splits, and field connections. Final arrangements depend on verified site drawings and the selected assembly, so confirm dimensions and access needs before approving layout and foundations.

05 /

Build a Complete Package for Quotation and Review

A useful purchasing package gives the manufacturer enough information to identify open engineering questions before they affect schedule or scope. Include the one-line diagram, motor and feeder schedules, control requirements, electrical studies, applicable project specifications, room and cable-entry drawings, and requested document submittals. State whether the project requires particular component preferences, spare space, spare units, metering, communications, or integration with existing equipment. Distinguish mandatory requirements from preferences, and identify deviations or unresolved data clearly; otherwise, bidders may price different assumptions that are difficult to compare. Ask for the proposed scope, exclusions, document list, review milestones, and information needed for release to production. UL 891 applies to appropriately evaluated low-voltage switchboard assemblies, not as a blanket designation for MCCs or medium-voltage equipment; applicable standards and evaluation requirements must be confirmed for the specified product.

06 /

Plan Manufacturing, Delivery, and Site Readiness Together

Schedule planning should begin with the project’s approval path and site constraints, not an assumed standard lead time. Custom construction and American components may be available for a project, but exact configuration, component availability, engineering review, and production timing must be confirmed when the scope is defined. Identify submittal review dates, required approval drawings, release-to-production conditions, factory documentation, and the date the site can receive equipment. Nationwide shipping does not remove the need to plan for unloading capacity, equipment handling, indoor storage, weather protection, and any site-specific receiving rules. Confirm shipping splits and access limitations early, especially when large assemblies must pass through restricted routes or arrive during a narrow outage window. Delivery commitments, packaging, and installation interfaces are project-specific; coordinate them with the contractor, facility team, and manufacturer before finalizing the purchase schedule.

THE DETAILS MATTER

Project
specifications.

Bring your requirements to the conversation. Final configurations are determined by the project scope and applicable standards.

Specifications and project considerations
ParameterProject consideration
ApplicationMotor Control Centers for Petrochemical Facilities
Voltage and configurationProject-specific; confirm in quotation
Continuous current and busProject-specific; confirm in quotation
Short-circuit ratingProject-specific; confirm in quotation
Standards and certificationAs applicable; verify for the proposed assembly
Component originAll-American options; confirm in quotation
Lead time and shippingProject-specific; nationwide shipping available
LET'S BUILD SOMETHING

Your project
starts here.

Tell us what you are planning. Share the details you have, and start a conversation about new equipment built for the job.

PREFER TO TALK?
(951) 403-5738
HOUSTON, TEXAS / NATIONWIDE
PROJECT INQUIRY

Request a quote

Fields marked with an asterisk are required.

Submitting opens your email application with your inquiry. Please send the prepared email to complete your request; no information is submitted through this website.

REQUEST A QUOTE