Rows of electrical cabinets and overhead cables along an industrial aisle
PLANNING GUIDES

Outdoor Switchgear Enclosure Selection.

New electrical distribution equipment built around your project. Discuss specifications, timing and delivery with a U.S. manufacturer.

01 BUILT FOR THE WORK AHEADEquipment photograph shown for illustration.
01 /
MADE IN USAAmerican components
02 /
UL 891Low-voltage switchboards
03 /
SHORT LEAD TIMESSchedule-focused planning
04 /
NATIONWIDEShipping available
01 /

Start With the Equipment Inside

Select an outdoor enclosure around the electrical assembly and its operating requirements, not its exterior dimensions alone. Document the distribution function, system voltage, bus arrangement, protective devices, available fault current, cable entry locations and required working clearances. Those details influence enclosure layout, compartment access, heat dissipation and the space needed for termination and maintenance. Identify whether the project involves a low-voltage switchboard, switchgear or another assembly; terminology and applicable construction requirements are not interchangeable. UL 891 applies to appropriately evaluated low-voltage switchboard assemblies, not automatically to medium- or high-voltage equipment or every enclosure. Provide one-line diagrams, load information and equipment interfaces early so the manufacturer can review the proposed configuration. Final ratings, construction and evaluation depend on the specific design.

02 /

Match Protection to the Actual Exposure

Outdoor service exposes equipment to rain, sunlight, windblown dust, temperature swings and, at some sites, salt, chemicals, ice or flooding. Describe the actual conditions rather than requesting a vague “weatherproof” cabinet. The required enclosure construction and environmental protection depend on exposure, installation details and the applicable project standards; a more protective enclosure can affect cooling, access and cost. Consider whether doors face prevailing weather, whether roof runoff can reach cable entries, and whether nearby processes release corrosive or conductive contaminants. Include the installation altitude and expected temperature range when they are relevant to equipment performance. Site photographs, environmental notes and owner specifications help resolve assumptions before drawings are finalized. Confirm the proposed equipment is suitable for the stated conditions and installation.

Copper busbars inside electrical equipment, shown for illustration
THE DETAILS BEHIND THE POWERIllustrative photograph; not represented as our facility. Photo: ToT89.
03 /

Plan Heat, Access and Service Space

A sealed or sun-exposed enclosure can retain heat, while added ventilation or cooling introduces its own maintenance and environmental considerations. Share expected loading, operating patterns, ambient conditions and any heat-producing devices with the equipment designer; do not assume a standard enclosure will manage every thermal condition. Check door swing, lifting provisions, cable-bending space and safe access to operating handles and service points against the site layout. Keep required electrical working space clear of fencing, piping, parked vehicles and future construction. If maintenance access depends on removable panels or a particular approach direction, show that on the plan. These checks matter because an assembly that fits its pad may still be difficult to install, operate or maintain once adjacent equipment and barriers are in place.

04 /

Set the Foundation and Cable Entry Before Ordering

Coordinate the enclosure footprint with the civil, structural and electrical drawings before releasing the order. Confirm the pad dimensions, anchor locations, finished elevation, drainage direction, conduit stub-ups and cable entry side; changes after fabrication can create costly field conflicts. The foundation must suit the equipment configuration and site conditions, with structural requirements established by the responsible project professionals. Avoid locating the assembly where standing water, snow storage, vehicle impact or routine washdown could compromise access or protection. Check that conduit positions leave adequate termination and bending space inside the equipment, and that the delivery route can accommodate the assembly’s shipping dimensions and handling method. A coordinated foundation plan and approved equipment drawings give contractors a practical reference for preparing the site.

05 /

Build a Quote Package That Supports Review

A useful request for quotation identifies the application and the decisions that affect configuration: system data, one-line diagram, load requirements, protective-device needs, enclosure exposure, cable arrangements and applicable owner or project standards. Include the intended installation location, operating access requirements and any interfaces with existing distribution equipment. For replacement or retrofit work, provide available nameplate information, measured site dimensions, photographs and details of connected conductors and controls; verify field information rather than relying on an old drawing alone. Ask the manufacturer to identify assumptions, exceptions and information still needed for design review. This makes competing proposals easier to compare and helps prevent a low initial price from concealing exclusions. Ratings, compatibility, standards, evaluation scope and final configuration must be confirmed for the specific project.

06 /

Coordinate Production, Shipment and Receiving

Discuss schedule needs with the U.S. manufacturer while the equipment scope is being developed, and confirm current availability against the approved configuration. Custom construction, design reviews, drawing approval, component selection and revisions can affect timing; a short lead-time offering is not a guaranteed delivery date for every project. Establish who will review drawings and how quickly comments must be returned, since unresolved submittals can hold up release. Before shipment, coordinate the receiving contact, delivery window, unloading equipment, access restrictions and a protected staging area. Compare the carrier’s anticipated delivery arrangement with the route from the site entrance to the pad, including gates, overhead clearances and surface conditions. Nationwide shipping can support projects across the United States, but the delivery plan and site readiness remain project-specific.

THE DETAILS MATTER

Project
specifications.

Bring your requirements to the conversation. Final configurations are determined by the project scope and applicable standards.

Specifications and project considerations
ParameterProject consideration
ApplicationOutdoor Switchgear Enclosure Selection
Voltage and configurationProject-specific; confirm in quotation
Continuous current and busProject-specific; confirm in quotation
Short-circuit ratingProject-specific; confirm in quotation
Standards and certificationAs applicable; verify for the proposed assembly
Component originAll-American options; confirm in quotation
Lead time and shippingProject-specific; nationwide shipping available
LET'S BUILD SOMETHING

Your project
starts here.

Tell us what you are planning. Share the details you have, and start a conversation about new equipment built for the job.

PREFER TO TALK?
(951) 403-5738
HOUSTON, TEXAS / NATIONWIDE
PROJECT INQUIRY

Request a quote

Fields marked with an asterisk are required.

Submitting opens your email application with your inquiry. Please send the prepared email to complete your request; no information is submitted through this website.

REQUEST A QUOTE